This Medical Centre red coloured carpark had a water mains burst underneath.
On completion of the repair work by the Plumbers we were contacted to compact and fill the excavation with roadbase and patch with a bitumen tack and 40mm thick layer of red gravelpave hotmix with 1% oxide.
The repair work has only just been completed and you can still see the water stains from the vibrating compacting roller which was used to give a smooth finish.
![](https://static.wixstatic.com/media/04193c_f867c632602243a2a5ebafcdf42efd8a~mv2.jpg/v1/fill/w_350,h_467,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/04193c_f867c632602243a2a5ebafcdf42efd8a~mv2.jpg)
Comentarios