This newly constructed house in the Northern suburb of Woodvale required an additional roadside parking bay to be installed to meet shire requirements. The excess fill / material / grass was removed and disposed off site. Roadbase was installed and compacted before being sealed with red gravelpave hotmix / asphalt / bitumen. The area was finished off with concrete kerb to protect the edges and linemarked.
Peter
留言