Red crossover/driveway construction - Lesmurdie
- Peter
- Mar 29, 2020
- 1 min read
Updated: Mar 31, 2020
Another angle of this newly constructed crossover and driveway with a full roadbase/limestone/gravel constructed base surface prior to sealing with a red gravelpave with 1% oxide asphalt/hotmix/bitumen to create a clean smooth long lasting surface.

Commentaires