top of page

Potholed area removed - bitumen laneway - Midland Perth

  • Peter
  • Apr 5, 2020
  • 1 min read

Here we have an asphalt/bitumen driveway/laneway which was badly worn in the Perth suburb of Midland. We cut out the damaged sections of bitumen/asphalt driveway and disposed of the old material. Once the underlying roadbase was prepared, we tacked and sealed it with 25mm thick asphalt. This is similar to a minor section of driveway construction.


Potholed area removed - bitumen laneway - Midland Perth
Potholed area removed - bitumen laneway - Midland Perth




Comments


Post: Blog2_Post
bottom of page