The owners of this Osborne Park showroom warehouse were concerned about a trip hazard in front of the building.
We sawcut the proposed edge of the ramp to be able to tie the new asphalt/hotmix ramp flush into the neighbouring surfaces.
The trip hazard has now been removed as their is no longer a lip from the asphalt/hotmix carpark to the concrete landing.
A bitumen tack was first applied to ensure good adhesion from old to new surfaces.
Yorumlar