Below are before and after photos of more work carried out in this Northern Perth suburb of Neerabup.
This heavy industrial yard had considerable work carried out with extensive fire hydrant services being installed.
Once the contractors had installed their pipework, sawcut the trenches, filled and compacted the limestone base we were contracted to install bitumen tack emulsion and 10mm granite black asphalt/hotmix @ 40mm thickness.
Once the finished surface was compacted the area was hosed down with water, cooling the surface and allowing for immedate use by heavy trucks and forklifts.
Comments