The carparks at this Shopping Centre are due to be resurfaced in 2021/2022. In the meantime, the potholes were swept clean, tacked with a bitumen emulsion and patched. Sections have also been cut out and re-sealed with a bitumen emulsion tack and 25mm thickness of 7mm granite black hotmix/asphalt.
Peter
Comentários