top of page
Peter

Maida Vale - crossover - asphalt - hotmix

This aging crossover had eroded and subsided substantially.


On our arrival we installed an additional layer of roadbase to fill the low lying section of eroded crossover and finished the basework off with a bitumen tack and a 25mm layer of 7mm granite black hotmix/asphalt.


The owner installed his own timber edging.

24 views0 comments

Kommentare


Post: Blog2_Post
bottom of page