top of page
Peter

Joondalup - patching - commercial - roadways

Below are before and after photos showing 3 sections of tree root damaged concrete kerb and asphalt roads.


The damaged kerb and asphalt were saw cut, excavated and removed from site.


Tree roots were cut and removed.


The roadbase was prepared, compacted and waterbound to form a hardstand surface.


New semi-mountable and flush concrete kerb was installed.


The asphalt was tacked with a bitumen emulsion and sealed with a 40mm thick layer of 100mm black granite hotmix/asphalt.

1 view0 comments

留言


Post: Blog2_Post
bottom of page