The existing bitumen surface along side the concrete entry to this warehouse had sunken and caused a dangerous lip for forklift access. The area was sawcut and removed. New black asphalt / hotmix was installed flush with surrounding surfaces. The job was completed in a few hours and the client was able to resume normal business operation immediately.
Peter
Comments