The photo below is an existing gravel hardstand crossover in the Perth hills suburb of Hovea.
The photo below shows the finished crossover.
We removed any debris from the existing surface, laid a 50 - 100mm layer of gravel which was levelled, compact and waterbound to leave a hardstand surface.
The surface was then tacked with a bitumen emulsion and sealed with a 7mm laterite/gravelpave hotmix with 1% oxide @ a minimum thickness of 25mm.
Kommentare