Hovea - asphalt parking area

Below are numerous pictures of different stages of a large carbay construction.


The existing hardstand area was scraped clean with a Bobcat loader, roadbase was supplied, installed, compacted and waterbound to form a hardstand surface.


Once the surface had dried out the area was tacked with a bitumen emulsion and sealed with 7mm granite black hotmix/asphalt @ 30mm thickness.


Following the completion of the hotmix/asphalt surface the client has installed poles and a carport.