Below is a driveway completed by us a few months ago.
The owner is now installing an electric gate which calls for the installation of a metal rail and concrete footings across the driveway.
Once the concrete had set we were contracted to form a ramp to the newly installed gate rail.
We saw cut and removed a 2 metre wide section of the driveway.
Roadbase was installed, compacted and waterbound to form a ramp to the required levels.
The new ramp was then sealed with a bitumen tack and a 40mm thick layer of 7mm red gravelpave/laterite hotmix/asphalt.