Below are 4 photos of a section of red asphalt/hotmix driveway in the Perth hills suburb of Gooseberry Hill.
A four metre long water diversion hump was constructed by our Company to ensure no road water entered the driveway from the verge area.
A section of the driveway near the boundary was re-heated, tacked with a bitumen emulsion and red laterite/gravelpave hotmix was used to form the hump.
A few cracks were also repaired throughout the rest of the driveway.
Red laterite/gravelpave hotmix/asphalt fines were used to fill the cracks which were then heated up and compacted with a vibrating roller.