Completed asphalt / bitumen / hotmix trench - after we sawcut and excavated this trench several days ago, a new electrical system was installed and we then returned to the site in West Perth to backfill and seal the trench over, allowing access to the asphalt bitumen carpark and driveways to re-open.
Peter
Kommentare