The edge of this driveway had deteriorated due to traffic driving over the edge and shifting the concrete kerb. We excavated and realigned the existing kerb, cut out and disposed of the damaged bitumen before laying new bitumen / asphalt/ hotmix to seal.
Peter
Comments