We installed this concrete culvert pipe and concrete headwalls on a rural crossover in Darlington in the Perth hills. The culvert allows stormwater to flow along the verge uninteruppted by the property owner's rural driveway. A gravel / limestone / roadbase hardstand was then installed over the top of the culvert pipe creating a strong basecourse, then asphalt / hotmix / bitumen was laid to seal the crossover.
Peter
Comments