top of page

Crossover resurface and extension - Perth - Upper Swan - Swan valley

Peter

This crossover was badly worn and did not line up with the left side of the brickpaved driveway. We prepared the left hand side with roadbase. Compacted and water bound to form a solid base for a new layer of asphalt - bitumen. The finished product is a smooth black hotmix surface that the client could use immediately to access his property.



Crossover resurface and extension - Perth - Upper Swan - Swan valley
Crossover resurface and extension - Perth - Upper Swan - Swan valley


Comments


Post: Blog2_Post
bottom of page