This child care facility in Mt Hawthorn, Perth had a problem of water pooling in the disabled bay near their entry.
The area was sawcut, removed and disposed off site.
Roadbase was installed to relevel and create fall to the existing drainage before black hotmix / bitumen / asphalt was used to seal the surface.
Peter
コメント