top of page
Peter

Black asphalt rear laneway (right of way) - Bassendean Perth

A new house was built on this property in the Bassendean suburb of Perth. During the construction of the house the existing laneway was damaged. We sawcut and removed all damaged material, disposing off site. Roadbase was used to prepare the area before flush concrete kerb was installed along one edge. Black hotmix / asphalt was laid to seal the area. All works were carried out to shire specifications.



14 views0 comments

Comments


Post: Blog2_Post
bottom of page