This existing bitumen crossover was badly worn, as well as having a dangerous step from the newly installed neighbouring concrete crossover. The area was swept clean, all potholes filled and a smooth ramp formed along the edge of the concrete crossover. The crossover was then resurfaced the 7mm black hotmix / asphalt. Location: Mt Nasura, Perth
Peter
Commentaires