This crossover began as a badly potholed and worn loose gravel surface. The existing surface was scraped clean before being re-leveled with new gravel. The crossover was then sealed with black asphalt / hotmix to create a smooth clean entry to the property. The owners chose not to re-new the concrete kerb at this stage. Location: Darlington, Perth
Comments