Below are photos of 3 subsided and damaged sections of loading bay which were cut out, swept clean, tacked with a bitumen emulsion and patched with a 14mm granite black hotmix approximately 60mm thick.
The patches were compacted thoroughly to avoid any possible damage which may be caused by their solid tyre forklift.
Comentarios