O'Connor - Industrial container yard patching
Below are before and after photos of an excavation around a soakwell which we were contracted to patch. The clients had installed a...
(08) 9454 4411
Below are before and after photos of an excavation around a soakwell which we were contracted to patch. The clients had installed a...
Below are various before, during and after photos of a red laterite asphalt driveway and crossover being constructed. The surface was...
Below are before, during and completed construction photos of a new crossover to a sub-divided rural property in Forrestfield. The...
The first 3 photos show the old bridge above Beenyup Brook which runs through our clients property. The bridge is collapsing and is a...
Below are before and after photos of an existing hardstand crossover with concrete headwalls which was in need of sealing with asphalt....
The 3 photos below show the damaged caused to a commerical carpark by a burst water pipe. The water pipe burst overnight and these photos...
The owner of this property contacted our Company to install a water diversion hump adjacent to a right-of-way at the rear. The water from...
Below are photos of various stages of a driveway and carpark construction project completed in Morley. All materials including sand,...
The client at this Hovea property was concerned about a water run-off flooding problem. We were contracted to form a water diversion hump...
This aging red asphalt driveway has been extended to the carport, a ramp has been formed to a new concrete platform and an 11 metre long...
Below are photos showing a long water diversion hump installed along the side of an existing red asphalt driveway. The client contacted...
Below are photos of 2 sites where proposed crossovers are to be installed and 2 photos of an old crossover which is to be widened and new...
The first 3 photos below show part of the verge prior to any of our work taking place. Our client requires a wide crossover on this...
Below are various photos of an existing hardstand roadbase driveway being sealed. The existing base was re-rolled, tacked with a bitumen...
Below are before and after photos of a bunded storage area set up to contain liquids if leaking occurs. The first three photos show a...
Below is a photo of a completed water diversion hump installed in line with the garden concrete kerb in front of a house entrance. On...
Below are photos of a reasonably steep driveway and a newly installed red water diversion hump. This property had the problem of excess...
Before and after pictures of a worn out shared crossover which was partially resurfaced as only one owner chose to do so. Half of this...
Below are before and after pictures of a potholed bitumen crossover and the asphalt/hotmix/bitumen potholed patch overlaying the damage...
Lesmurdie in the Perth Hills has areas where storm water drains are not part of the street and each property has a drainage trench...