Bayswater - carpark - yard - resurface
On completion of the preparation and resurfacing with 25mm layer of asphalt/hotmix/bitumen the area was scattered with yellow sand to...
(08) 9454 4411
On completion of the preparation and resurfacing with 25mm layer of asphalt/hotmix/bitumen the area was scattered with yellow sand to...
Below are before and after photos of pothole patching repairs throughout roadways in a Western Australian National Park. The potholes in...
This roadside parking area was prepared with a limestone sub-base and roadbase to attain the correct levels and fall back to the road. ...
This child care facility in Mt Hawthorn, Perth had a problem of water pooling in the disabled bay near their entry. The area was sawcut,...
In preparation for securing this carpark concrete pedestrian ramps have been installed prior to the security fencing enclosing the entire...
Further work to this Armadale commercial carpark included narrowing the exit driveway and making ready for new electric sliding gates by...
New wheelstops installed into this commercial/public department carpark getting ready to secure with fencing, bollards and sliding...
Another view of this excavation receiving its' final roll and compaction with a vibrating roller to compact the 25mm thick...
This newly leased commercial property was being prepared for the new tenant's employees to park their cars. The hydrant was recently...
This car parking area was prepared earlier in the week with limestone and roadbase. After installing new concrete kerb to the sides, the...
This commerical shopping centre was undergoing renovations and extensions. The area was excavated to install new drainage. We installed...
This existing carpark in the suburb of Bentley was not big enough to accommodate the growing number of cars. Several garden beds were...
The driveway through the middle of this warehouse was badly damaged. The area was sawcut, excavated and disposed off site. Black...
Several trees were removed and replaced in this commercial carpark in the Perth suburb of Malaga. The surrounding kerb and asphalt...
This existing carpark in the suburb of Bentley was not big enough to accommodate the growing number of cars. Several garden beds were...
The existing surface along the edge of this concrete carpark had sunken and cracked causing a trip hazard for pedestrians. The damaged...
Below are before and after photos of hazardous potholes that appeared recently in a northern suburb shopping centre. The potholes were...
Another angle of this 5 year old plus gravel hardstand compacted carpark with daily vehicle use - still lasting well. At any time this...
This hardstand carpark with daily traffic is still wearing well after approximately 5 years of use. The top layer of gravel has loosened...
This carpark which is worn and full of potholes was resurfaced with a layer of black/asphalt/hotmix/bitumen. The carbays were re-marked...